4 Bespoke Modular Switchgear Enclosures for a UK Power Station

UK Power Station Bespoke Modular Switchrooms

4 Bespoke Modular Switchgear Enclosures for a UK Power Station

Project Complete
ADE were appointed by a leading global manufacturer of electrical control systems to design and manufacture 4 bespoke modular switchgear enclosures to house their critical energy control and distribution equipment for a UK Combined Cycle Gas Turbine (CCGT) Combined Heat and Power (CHP) power station.

The scope consisted of an LV module, MV module, VSD (variable speed drive) module and a termination chamber module. To accelerate programme delivery and enable parallel working, ADE proposed a hybrid manufacturing strategy. While the VSD module was manufactured and fitted out in a traditional method, the remaining 3 modules were delivered utilising a “skid and lid” approach.

For the LV, MV and termination chamber modules, the “skids” (the structural bases) and the “lids” (the wall and roof assemblies) were fabricated and painted separately. Once complete, the skids were delivered to the client for installation of their switchgear and associated equipment, while ADE simultaneously fitted out the lids with lighting, small power, earthing, HVAC and other required auxiliary equipment. The equipped skids were then returned to ADE for final test fitting and quality checks prior to dispatch. Due to weight restrictions, the skids and lids were transported to site separately for final assembly.

The 2 largest enclosures, the LV and MV modules, each measured 18 metres long, over 4 metres wide and 4 metres high. All 4 enclosures received a C5M paint finish for corrosion protection to suit the site environment.

On site, the enclosures were positioned and installed by ADE engineers, with the LV, MV and VSD modules combined to form a single multi-module structure atop a 1.4 metre-high galvanised substructure, complete with access platforms and stairs also supplied by ADE.

Following positioning and mechanical installation, ADE engineers also installed all the interconnecting cabling between the equipment housed within the 4 enclosures. The completed installation now provides secure, reliable housing for vital power control infrastructure supporting electricity generation at the facility.
Latest News & Case Studies
Modular Substation Acoustic and Modular Enclosures

Critical Generation & Distribution Enclosures

Bespoke acoustic and modular enclosures complete with a 13,000L bulk tank to form a packaged modular substation for emergency standby power at a UK prison.
London Data Centre 32 Acoustic Standby Generator Enclosures

London Data Centre Packaging

32 bespoke 60 dB(A) at 7m Acoustic Enclosures housing 3030 kVA MTU emergency standby generators and auxiliary equipment for a data centre in London, UK.
Switzerland Infrastructure Bespoke Generator Acoustic Enclosures

Swiss Infrastructure Backup Enclosures

3 bespoke 65 dB(A) at 1m acoustic enclosures to house 670 kVA Volvo diesel generators to support critical infrastructure within a major city in Switzerland.
Netherlands Data Centre 14 Bespoke Acoustic Emergency Standby Diesel Generator Enclosures

Netherlands Data Centre Enclosures

Phase 1 of this project: 14 bespoke 85 dB(A) at 1m acoustic enclosures housing 3500 kVA CAT standby generators for a hyperscale data centre in the Netherlands.
London Data Centre 32 Acoustic Standby Generator Enclosures

London Data Centre Packaging

32 bespoke 60 dB(A) at 7m Acoustic Enclosures housing 3030 kVA MTU emergency standby generators and auxiliary equipment for a data centre in London, UK.
For more information about our acoustic & modular enclosures